Palletised cartons at a factory dispatch bay

Selected work

Programmes we run today

Under NDA we can name names. Here is the shape of the work and what mattered about each tool.

Selected work

Programmes we run today

Under NDA we can name names; here is the shape of the work — the part, the sector, and what mattered about the tool.

Rows of pale blue plastic bottle closures on a filling line

Beverage

Tamper-evident closures, 16-cavity

A thin-wall PP closure for a regional bottler, moulded on a 250-tonne cell at a 4.1-second cycle. A hot-runner valve gate and conformal cooling hold the slip band flat across all sixteen cavities; we run 2.4 million a week to a VMI bin at their filling hall.

A hand measuring a machined part with a digital caliper

Medical devices

Diagnostic analyser housing set

A five-part enclosure for a benchtop analyser, moulded in flame-rated ABS in our Class 8 bay. Every shot is weighed, and each set ships with a certificate of conformance; tolerances on the optical mounts are held to ±0.03 mm and verified on the CMM.

Black moulded plastic components in a vehicle engine bay

Automotive

Under-bonnet connector bodies

Glass-filled PA66 connector housings for a Tier-1 wiring supplier, run with brass inserts overmoulded in a vertical cell. Full PPAP, IATF-controlled, with SPC on the critical pin-lead dimension and traceability from resin lot to despatch note.

From the buyers

What supplier quality tells us

AA

Aster Automotive Systems

The tool came in on the date they quoted, and the T1 report matched the drawing line for line. Two years in, the process hasn't drifted — we've stopped incoming-inspecting the part.

Ahmad Faizal — Supplier Quality Manager
DI

Delta Instruments (M)

Keystone took our enclosure from a rough STEP file to a validated five-cavity tool without us flying anyone over. The DFM notes alone saved us a mould revision.

Lim Wei Sheng — Head of Operations
LE

Lumen Electrical

They run our closures to a VMI bin at our filling hall and we have never held the line for stock. Documentation for the audit was ready the same afternoon we asked.

Sarah Menon — Procurement Lead

Have a part to quote?

Send us a drawing and a volume. We'll send back a plan.

A quote covers the tool, the part price at your volume, the lead time and the DFM changes we'd recommend. No obligation, and your files stay under NDA.