Robotic cells running an automated assembly line inside a modern factory

Contract toolmaking & injection moulding · Penang

We build the tool, prove the process, and mould the parts your line runs on.

Keystone Mould is a Tier-1 moulding partner for automotive, medical and electronics manufacturers across Malaysia — from DFM review and hardened tooling to validated, high-cavitation production.

Trusted on the line by manufacturers across Malaysia

  • Aster Automotive Systems
  • Delta Instruments (M)
  • Lumen Electrical
  • Selat Medikal
  • Perintis Mobility
  • KL Fluidics
  • Northgate E&E

What we run

A tool room and a moulding floor, under one roof

Cutting fluid flooding a CNC cutter mid-cut in the tool room

Mould design & DFM

Every enquiry starts with a design-for-manufacture review: gating and cooling laid out in Moldflow, tolerances agreed against your drawing, and a tooling plan costed before a single block is cut.

01

Tool room

CNC milling, sinker & wire EDM, jig grinding and full spotting presses for tools up to 6 tonnes.

02

Injection moulding

48 presses from 50 to 850 tonne, all with robots, gravimetric dosing and cavity-pressure monitoring.

03

Insert & overmoulding

Vertical and shuttle cells for brass inserts, stampings and two-shot soft-touch parts.

04

Cleanroom moulding

An ISO Class 8 (100,000) bay for medical and optical components, gowned and particle-counted.

05

Finishing & assembly

Pad printing, ultrasonic welding, leak testing and kitted sub-assembly, done in-house.

Capacity, in plain numbers

22
years moulding

Family-owned since 2003, Batu Kawan

48
injection presses

50–850 tonne, all robot-served

190M
parts a year

Across 60+ active production tools

±0.02
mm repeatability

Verified on CMM and vision

18
export markets

ASEAN, EU, North America, Japan

From enquiry to first shipment

How a job moves through the plant

01

Enquiry & DFM

Send the drawing, resin and annual volume. We return a DFM note, a tooling quote and a lead time, usually within three working days.

02

Tooling & T1 samples

The mould is cut and assembled in our tool room, then sampled. You get T1 parts with a full dimensional report.

03

Validation & PPAP

Process windows are set and locked, capability is proven, and we submit ISIR or full PPAP to your requirement.

04

Production & delivery

Scheduled runs with in-line checks, then kitted, labelled and shipped — ex-works, DAP or into your VMI bins.

Selected work

Programmes we run today

Under NDA we can name names; here is the shape of the work — the part, the sector, and what mattered about the tool.

Rows of pale blue plastic bottle closures on a filling line

Beverage

Tamper-evident closures, 16-cavity

A thin-wall PP closure for a regional bottler, moulded on a 250-tonne cell at a 4.1-second cycle. A hot-runner valve gate and conformal cooling hold the slip band flat across all sixteen cavities; we run 2.4 million a week to a VMI bin at their filling hall.

A hand measuring a machined part with a digital caliper

Medical devices

Diagnostic analyser housing set

A five-part enclosure for a benchtop analyser, moulded in flame-rated ABS in our Class 8 bay. Every shot is weighed, and each set ships with a certificate of conformance; tolerances on the optical mounts are held to ±0.03 mm and verified on the CMM.

Black moulded plastic components in a vehicle engine bay

Automotive

Under-bonnet connector bodies

Glass-filled PA66 connector housings for a Tier-1 wiring supplier, run with brass inserts overmoulded in a vertical cell. Full PPAP, IATF-controlled, with SPC on the critical pin-lead dimension and traceability from resin lot to despatch note.

From the buyers

What supplier quality tells us

AA

Aster Automotive Systems

The tool came in on the date they quoted, and the T1 report matched the drawing line for line. Two years in, the process hasn't drifted — we've stopped incoming-inspecting the part.

Ahmad Faizal — Supplier Quality Manager
DI

Delta Instruments (M)

Keystone took our enclosure from a rough STEP file to a validated five-cavity tool without us flying anyone over. The DFM notes alone saved us a mould revision.

Lim Wei Sheng — Head of Operations
LE

Lumen Electrical

They run our closures to a VMI bin at our filling hall and we have never held the line for stock. Documentation for the audit was ready the same afternoon we asked.

Sarah Menon — Procurement Lead

Before you send an RFQ

The questions procurement asks first

For a single-face tool of moderate complexity, six to eight weeks from a frozen design to T1 samples. Multi-cavity, hot-runner or family tools run eight to twelve. We give you a firm date with the tooling quote and a weekly build report against it.

Have a part to quote?

Send us a drawing and a volume. We'll send back a plan.

A quote covers the tool, the part price at your volume, the lead time and the DFM changes we'd recommend. No obligation, and your files stay under NDA.